Is there a key to SL, O, GR, BL, BR in the S plan wiring ?

Options
coinkerr
coinkerr
edited September 2023 in General Questions & Topics

I have an old Ideal Mexico 2 which just requires a live input to turn on. This once came from a timeclock but I replaced this with an Arduino and relay a while back. Wife not happy with any home built system hence need to instal the TADO (Starter Kit V3+).

Edit: Google tells me SL is switched live which sounds like the one I need, but in the wiring diagram it does not appear to connect to the controller, connecting only to O.

I’ll appreciate advice.

Best Answer

  • coinkerr
    coinkerr
    Answer ✓
    Options
    I've figured it out. BR is the switched live that goes to the boiler. It's all working.

Answers